Painting · Drywall · Interior finishes

More bids out the door.Fewer nights buried in plans.

Remote preconstruction support that turns drawings and specs into defensible quantities, clear assumptions, and bid-ready files.

24–72hStandard single-trade delivery
EditableFiles you can audit and reuse
NationwideRemote U.S. project coverage
Scope reviewREADYLBW / PRECON
Bid packageChecked
Wall finish42,680 SF
Ceilings18,240 SF
Doors + frames186 EA
Scope completeness98%

FIELD-INFORMED ESTIMATING

FIXED SCOPE BEFORE WORK

NO AWARD GUARANTEES. NO GUESSWORK.

What we do

Your overflow bid desk—without another full-time salary.

Use us for one urgent takeoff or as recurring estimating capacity. Every assignment starts with a written scope and ends with files your team can inspect.

01

Quantity Takeoffs

Measured quantities organized by area, assembly, coat, layer, or finish—plus clear plan references and marked-up drawings.

From $295Scope it
02

Bid-Ready Estimates

Takeoff, labor assumptions, material allowances, exclusions, and an editable pricing worksheet ready for your final review.

From $595Scope it
03

Commercial Bid Support

Larger commercial, multifamily, and phased scopes with addenda control, scope clarifications, and proposal support.

From $1,250Scope it

The workflow

A controlled path from plans to a bid you understand.

Speed matters. Scope control matters more. Our workflow makes assumptions, addenda, ownership, and review visible before the deadline starts squeezing judgment out of the room.

01

Send the bid package

Plans, specifications, addenda, bid form, project location, and deadline.

02

Approve the scope

You receive a fixed quote, turnaround, assumptions, and exact deliverables before work starts.

03

We measure + build

The estimator completes the takeoff and estimate; a second pass checks scope, math, and document control.

04

Review + submit

You receive marked plans and editable files, then make the final commercial decision before submission.

What arrives

Not a mystery number in a PDF.

A useful estimate should show where quantities came from, what was assumed, what was excluded, and what changed. That is the standard.

  • Color-coded plan markups
  • Editable quantity worksheet
  • Labor + material assumptions
  • Scope inclusions and exclusions
  • Addenda and revision log
  • Bid-form support when selected
LBW-26041INTERIOR FINISHES — BID SUMMARY
REV 02
ProjectCommerce CenterDrawing setIssued for bidAddenda01–03 included
ScopeQty.UnitRef.
Gypsum walls31,420SFA6.10
Painted ceilings18,240SFA6.12
Hollow metal frames142EAA8.01
Wood doors96EAA8.02

QA note Quantities reconciled to finish schedule and addendum 03.

Transparent starting points

Price the effort—not a random percentage of the job.

Final fees depend on relevant sheet count, trade scope, document quality, project phasing, and deadline. You approve a fixed quote before production begins.

Small / defined scope$295–$695

Single trade, organized documents, standard turnaround.

Mid-size commercial$795–$1,695

More sheets, alternates, phased areas, or bid-form support.

Large / complex$2,500+

Multifamily, multiple buildings, incomplete plans, or tight addenda.

Recurring bid deskFrom $1,750/mo

Reserved monthly capacity for contractors bidding every week.

Rush delivery is capacity-dependent. Scope changes and new addenda after production begins are quoted separately.

Built for specialty trades

We speak in scope, production, and exclusions.

Painting contractors

Walls, ceilings, doors, frames, trim, coatings, and production assumptions.

Drywall + framing teams

Board, partitions, ceilings, finish levels, insulation, and accessory counts.

Finish-trade contractors

Flooring, wallcovering, ACT, trim, and defined interior-finish scopes.

Important boundary

Lorenzi BidWorks provides estimating and preconstruction support. Your company makes the final price, contract, licensing, and bid-submission decisions.

Straight answers

Before you send the plans.

What do you need to quote an estimate?

Plans, specifications, addenda, project location, trade scope, bid form if applicable, and the real submission deadline.

Do you guarantee that we will win the project?

No. A responsible estimator can improve completeness and speed; nobody can honestly guarantee award, competitor behavior, or final field cost.

Are revisions included?

Corrections to the agreed scope are included. Owner or design changes, new addenda, and scope expansion are priced separately.

Will you submit the bid for us?

We can prepare bid forms and submission-ready files when selected. Your authorized company representative reviews and approves the final submission.

Next bid

Send the package. Get a fixed scope and fee.

We will review the documents, flag missing information, and tell you what can be delivered before your deadline.

Request a scope review